Your Custom Text Here
CONSTRUCTION PHOTO
Demolition has begun. As a small space, the work will now move quickly. In our first meeting, we discussed cabinetry, lighting, matching the brick wall finish, and the construction timeframe.
We will update the progress of the project weekly until opening in June 2020.
INTERIOR HAIR WASH STATION AND COLUMN DETAILS
The hairwash station will feature upper cabinets with pink and gold wallpaper. The existing brick finishes will be matched and refinished along the upper wall over the hair wash station.
The existing structural column will be finished in a soft white wainscotting and a bright mirror finish with display shelves.
INTERIOR WALLS AT THE SALON STATIONS
Each salon station will consist of a tall mirror box with a lighted frame for even lighting for the client. The finishes include pink and gold wallpaper, gold globe lights, rose gold mirrors, white brick, and white wainscotting.
GLOBE LIGHT CHANDALIER
The project will use globe lighting at the interior to light the space evenly.
WALLPAPER
The interior walld will feature a bold pink wallpaper.